In 2009, an 82,000 square metre logistics facility was completed outside Jönköping on behalf of Prologis. ​

During the busiest period of construction a concrete truck arrived every six minutes during the daytime and construction continued overnight. A total of 90,000 tonnes of concrete were used during construction, along with 8,000 tonnes of rebar. At the peak of construction, 110 people were working on the site.

Special measures were taken to manage rainwater, which is essential when sites of this size are hard-surfaced. The surface water pond that was created has now been stocked with game fish. A stream that ran through the site also had to be rerouted​.